REST® Evercool®+ Cooling Pillowcases King by REST

REST® Evercool®+ Cooling Pillowcases King

$132.17
Sale price  $132.17 Regular price 
Skip to product information
REST® Evercool®+ Cooling Pillowcases King by REST

REST® Evercool®+ Cooling Pillowcases King

$132.17
Sale price  $132.17 Regular price 

Product Overview

The REST® Evercool®+ Cooling Pillowcases King - 2 Pillowcases for Sensitive Skin is a Pillowcases product. It features instant cooling: experience sleeping on the cold side of the.

Key Features

  • Instant Cooling: Experience sleeping on the cold side of the pillow with Rest’s advanced cooling pillowcases; Wake up refreshed and rejuvenated with cutting-edge performance fabric that offers instant and long-lasting cooling sensation; Evercool pillowcases are ideal for all seasons and hot sleepers with night sweats, hot flashes
  • Luxuriously Soft and Smooth: Science-backed fabric innovation that’s softer, smoother and stronger than silk; Glides effortlessly against your skin for frictionless sleep and prevent crush wrinkles caused by side sleeping; Elevate your sleep with unbelievable comfort
  • Always a Good Hair Day: Reduce friction, prevent frizz and hair damage with Evercool’s ultra-fine, super smooth fabric; Curly and wavy hair approved with our anti-static cooling pillowcases that don’t pull or tug; Don’t wake up tired or with messy hair ever again
  • Self-Cleaning Fabric Tech: Lasting hygienic pillowcases for sensitive skins. With Noble's Ionic+ extruded silver yarn technology, positively charged silver ions are permanently embedded into Evercool+ fiber; The pillow case is self-cleaning to effectively inhibit and eliminate odor
  • Stain Resistant: Resistant to oil absorption; The pillowcases will always look and feel brand new, without stains or color fading; Plus, you can rest assure any skin care products will stay where they belong, and you can look and feel your best

Why Choose the REST® Evercool®+ Cooling Pillowcases King - 2 Pillowcases for Sensitive Skin

The REST® Evercool®+ Cooling Pillowcases King - 2 Pillowcases for Sensitive Skin offers instant cooling: experience sleeping on the cold side and luxuriously soft and smooth: science-backed fabric innovation that’s. These features make the REST® Evercool®+ Cooling Pillowcases King - 2 Pillowcases for Sensitive Skin a strong option in the Pillowcases category.

Best For

The REST® Evercool®+ Cooling Pillowcases King - 2 Pillowcases for Sensitive Skin is best suited for: all seasons and hot sleepers with night sweats.

Quick Summary

The REST® Evercool®+ Cooling Pillowcases King - 2 Pillowcases for Sensitive Skin is a Pillowcases product by REST. Size: King (2 pcs). Material: Evercool+ Performance Fabric. Brand: REST. Color: Light Blue. Product Care Instructions: Washing: 1) Wash on low with a low alkaline or neutral Ph detergent. 2) Cold water and low spin. 3) Don't bleach. 4) Don't use fabric softener. Drying: 1) Tumble dry on low/no heat or line dry. 2) Don't use iron. 3) Don't dry clean. Washing: 1) Wash on low with a low alkaline or neutral Ph detergent. 2) Cold water and low spin. 3) Don't bleach. 4) Don't use fabr… See more. Price: $110.14.

Product Specifications

Specification Details
Size King (2 pcs)
Material Evercool+ Performance Fabric
Brand REST
Color Light Blue
Product Care Instructions Washing: 1) Wash on low with a low alkaline or neutral Ph detergent. 2) Cold water and low spin. 3) Don't bleach. 4) Don't use fabric softener. Drying: 1) Tumble dry on low/no heat or line dry. 2) Don't use iron. 3) Don't dry clean. Washing: 1) Wash on low with a low alkaline or neutral Ph detergent. 2) Cold water and low spin. 3) Don't bleach. 4) Don't use fabr… See more

You may also like